WESTFIELD FARM · SOLAR + BESS

Powering the future
at Westfield.

A proposed large-scale solar farm, battery energy storage system and EV charging solution designed around the Westfield Farm development.

Solar energy

A substantial renewable-energy proposal.

Project overview

The technical design models a 4.09 MWp solar PV installation using 6,334 modules across approximately 17,109 m², integrated with battery storage and EV charging infrastructure.

The proposal is intended to combine on-site renewable generation, battery storage, direct consumption and export to the grid, supporting the wider EV-led Westfield Farm concept.

0 MWpSolar PV capacity
0Solar modules
0 MWhApprox. battery storage
0 GWhModelled annual generation
0%Modelled self-sufficiency
0 tModelled CO₂ avoided / year
Solar farm system design from the project specificationSolar Farm + BESS concept — project specification
Generation + storage

Solar, battery and EV charging working together.

☀ Solar generation4.09 MWp PV array
▣ Battery storageApprox. 5.05 MWh BESS
⚡ EV + site demandUse, store or export energy

Solar Farm

The model forecasts approximately 3.82 million kWh of annual solar generation. Around 2.16 million kWh is modelled for direct consumption, approximately 576,000 kWh for battery charging and around 1.05 million kWh for grid export.

Battery Energy Storage — BESS

The design specifies ten Sungrow PowerStack battery systems at approximately 504.6 kWh each, providing around 5.05 MWh of combined storage capacity. Stored solar energy can support demand when instantaneous PV production is lower.

EV charging integration

The simulation includes EV charging demand as part of the wider energy model. This connects the solar and storage proposal directly to the site's EV-led roadside-service strategy.

Modelled energy performance

72.6% own-power consumption and 68.6% self-sufficiency, with approximately 1,432 tonnes of CO₂ emissions avoided annually.

Solar module layout from project specificationSolar module layout detail from project specification
Financial model

Indicative investment & returns.

Modelled financial case

The report models a total investment of approximately £10.21 million, with a calculated 20.54% IRR and an estimated payback period of approximately 6 years 2 months.

£0mModelled investment
0%Modelled IRR
0y 2mModelled payback

The first-year assumptions include approximately £682,000 of electricity savings and approximately £158,000 of export income. The financial model also includes other revenue/savings associated with the EV charging tariff.

Important

These figures are projections from the supplied technical simulation, not guaranteed financial returns. Actual generation, consumption, tariffs, operating costs and commercial performance may differ.